Updated weekly

Giorgetti furniture we can move soonest.

Giorgetti builds to order, so nothing here sits in a warehouse. What this list holds is the pieces with the shortest route to your room: standard configurations, current build slots and a lead time we can stand behind today.

Giorgetti Aton 3 seater fabric sofa, cut out of the studio shot

How a piece gets on this list.

It means the configuration is a standard one, the factory has a slot for it, and we have checked the lead time this week rather than last quarter. It does not mean a crate is waiting at a dock, because Giorgetti does not work that way and we will not pretend it does.

Add a piece to your request with the button beside it and it writes itself into the form at the foot of the page. Send the form and the quote comes back with the price, the finishes still open on that slot and the date it would land.

The list gets rebuilt once or twice a week. A piece drops off it when the slot is taken and comes back when the next one opens.

Held in stock
Nothing, every piece is built
What is checked weekly
Build slots and lead times
Price
Quoted per order, always
Configuration
Standard, changes push the date out
Ships to
The United States
Deposit
Agreed when the order is placed

Next build slots

The pieces with the shortest route.

Lead times run from the day the order is confirmed to the day the piece leaves Meda, before freight. Updated November 19, 2026.

  • Giorgetti Adam fabric sofa, made in Meda, Italy

    Adam

    Fabric sofa. Carlo Colombo, 2018. Built to order in Meda.

    Collection
    Adam
    Time on the bench
    10 to 12 weeks
    Price
    Quoted per order
  • Giorgetti Aei rectangular wooden console table with drawers, made in Meda, Italy

    Aei

    Rectangular wooden console table with drawers. Chi Wing Lo, 2011. Built to order in Meda.

    Collection
    Aei
    Time on the bench
    12 to 14 weeks
    Price
    Quoted per order
  • Giorgetti Galet fabric day bed, made in Meda, Italy

    Galet

    Fabric day bed. Palomba Serafini Associati, 2017. Built to order in Meda.

    Collection
    Galet
    Time on the bench
    14 to 16 weeks
    Price
    Quoted per order
  • Giorgetti Frame double bed with upholstered headboard, made in Meda, Italy

    Frame

    Double bed with upholstered headboard. Carlo Colombo, 2017. Built to order in Meda.

    Collection
    Frame
    Time on the bench
    10 to 12 weeks
    Price
    Quoted per order
  • Giorgetti Calathea trestle-based leather and fabric easy chair, made in Meda, Italy

    Calathea

    Trestle-based leather and fabric easy chair. Roberto Lazzeroni, 2023. Built to order in Meda.

    Collection
    Calathea
    Time on the bench
    12 to 14 weeks
    Price
    Quoted per order
  • Giorgetti Charlotte walnut sideboard, made in Meda, Italy

    Charlotte

    Walnut sideboard. Carlo Colombo, 2018. Built to order in Meda.

    Collection
    Charlotte
    Time on the bench
    14 to 16 weeks
    Price
    Quoted per order

Collections

Specification

The same pieces, card by card.

Lead time is to the factory gate. Add about seven weeks for sea freight, customs and the delivery to your room, or ask about air freight if the date is tight.

  1. Adam sofa12
  2. Aei console table14
  3. Galet day bed16
  4. Frame double bed12
  5. Calathea easy chair14
  6. Charlotte sideboard16
The longer end of each lead time, drawn to one scale. Freight to the United States adds about seven weeks on top of every bar.
  • Adam sofa

    Collection
    Adam
    Lead time to the gate
    10 to 12 weeks
    Price
    Quoted per order
  • Aei console table

    Collection
    Aei
    Lead time to the gate
    12 to 14 weeks
    Price
    Quoted per order
  • Galet day bed

    Collection
    Galet
    Lead time to the gate
    14 to 16 weeks
    Price
    Quoted per order
  • Frame double bed

    Collection
    Frame
    Lead time to the gate
    10 to 12 weeks
    Price
    Quoted per order
  • Calathea easy chair

    Collection
    Calathea
    Lead time to the gate
    12 to 14 weeks
    Price
    Quoted per order
  • Charlotte sideboard

    Collection
    Charlotte
    Lead time to the gate
    14 to 16 weeks
    Price
    Quoted per order
Giorgetti pieces we can put into a build slot soonest, with the lead time on each

The workshop slip

Ask what these cost.

Use the buttons above to drop a piece into this form, or name what you want. The quote comes back with the price, the open finishes and the date.

  1. 1Name the piece and the room. A collection name is enough; sizes and a photo of the space help.
  2. 2A written price in one business day. Price, finishes and lead time, from the Houston desk (Monday to Friday, 9:00 to 18:00 Central time).
  3. 3Confirm, and the Meda workshop builds it. Freight, customs and delivery to the room are part of the quote.
A quick check

Fields with a star are required. A specialist answers within one business day by email, with a written quote or the few questions needed to price it. Nothing is charged on this site.